Polestar
Polestar 2 charging guide
We cover 9 versions of the Polestar 2, with usable batteries from 66 to 79 kWh and rapid charging at up to 207 kW. It uses Type 2 for home charging and CCS for rapid charging. Charging speeds and times differ between versions, so pick yours for the full guide.

Pick your version
Not sure which you have? The version is usually on the boot lid or in your registration document (V5C).
Long Range Dual Motor (2020–2023)
75 kWh · 11 kW home · 149 kW rapid · 10–80% about 34 min
Long Range Single Motor (2021–2023)
75 kWh · 11 kW home · 149 kW rapid · 10–80% about 34 min
Long Range Single Motor (2023–2025)
79 kWh · 11 kW home · 207 kW rapid · 10–80% about 32 min
Standard Range Single Motor (2023–2025)
66 kWh · 11 kW home · 136 kW rapid · 10–80% about 26 min
Long Range Dual Motor (2024–2025)
79 kWh · 11 kW home · 207 kW rapid · 10–80% about 32 min
Long Range Dual Motor (2025 on)
79 kWh · 11 kW home · Rapid speed being checked · 10–80% about 30 min
Long Range Performance (2025 on)
79 kWh · 11 kW home · Rapid speed being checked · 10–80% about 30 min
Long Range Single Motor (2025 on)
79 kWh · 11 kW home · Rapid speed being checked · 10–80% about 30 min
Standard Range Single Motor (2025 on)
67 kWh · 11 kW home · Rapid speed being checked · 10–80% about 28 min
Heads up
Buying a used 2
Every version we cover, oldest first, so you can see what you get for the year you're looking at.
| Years | Version | Usable battery | Rapid max | 10% to 80% | Preconditioning | Heat pump | Rapid plug |
|---|---|---|---|---|---|---|---|
| 2020–2023 | Long Range Dual Motor | 75 kWh | 149 kW | about 34 min | Yes | Optional | CCS |
| 2021–2023 | Long Range Single Motor | 75 kWh | 149 kW | about 34 min | Yes | Yes | CCS |
| 2023–2025 | Long Range Single Motor | 79 kWh | 207 kW | about 32 min | Yes | Yes | CCS |
| 2023–2025 | Standard Range Single Motor | 66 kWh | 136 kW | about 26 min | Yes | Yes | CCS |
| 2024–2025 | Long Range Dual Motor | 79 kWh | 207 kW | about 32 min | Yes | Optional | CCS |
| 2025 on | Long Range Dual Motor | 79 kWh | Checking | about 30 min | Manual only | Check | CCS |
| 2025 on | Long Range Performance | 79 kWh | Checking | about 30 min | Manual only | Check | CCS |
| 2025 on | Long Range Single Motor | 79 kWh | Checking | about 30 min | Manual only | Check | CCS |
| 2025 on | Standard Range Single Motor | 67 kWh | Checking | about 28 min | Manual only | Check | CCS |
What changed
- Versions from 2023 charge faster on rapid chargers (up to 207 kW vs 149 kW).
- Bigger battery from 2023 (79 kWh vs 75 kWh).
Checklist for this car
Battery health, warranty, cables and test-drive checks are all in our used electric car checklist.
Some details for this car are still being checked — confirm with the seller or handbook.
Compare versions side by side
Tick up to three versions of the Polestar 2. Times are estimates from the same maths as our calculators, so real times vary with weather and the charger.
| What | Long Range Performance (2025 on) | Long Range Single Motor (2025 on) | Standard Range Single Motor (2025 on) |
|---|---|---|---|
| Usable batteryHow much energy the car can actually use (kWh). | 79 kWhHighest | 79 kWhHighest | 67 kWh |
| Real-world rangeTypical miles on a full charge in mixed UK driving. | about 275 miles | about 295 milesHighest | about 250 miles |
| Home charging speedFastest AC charging the car accepts (kW). | 11 kW | 11 kW | 11 kW |
| Rapid charging speedPeak DC charging speed (kW). | Checking | Checking | Checking |
| Home wallbox, 0–100%On a 7 kW home charger. | 12 h 42 min | 12 h 42 min | 10 h 48 minQuickest |
| 50 kW rapid, 10–80%A common motorway services charger. | about 30 min | about 30 min | about 28 minQuickest |
| 150 kW ultra-rapid, 10–80%Only as fast as the car allows. | about 30 min | about 30 min | about 28 minQuickest |