Skip to content
EV for Beginners

Jeep

Jeep Avenger charging guide

We cover one version of the Jeep Avenger, with a 50.8 kWh usable battery. It uses Type 2 for home charging and CCS for rapid charging. Charging speeds and times differ between versions, so pick yours for the full guide.

Grant: up to £1,500 off newElectric Car Grant, new cars only, price must be £37,000 or less. The dealer takes it off the price. Checked November 2026.
Jeep Avenger illustration
Illustration

Your version

Not sure which you have? The version is usually on the boot lid or in your registration document (V5C).

Versions of the Jeep Avenger and their charging figures
VersionYearsBatteryHome (AC)Rapid (DC)10% to 80%
ElectricDetails being checkedGrant: up to £1,500 off new2026 on50.8 kWh11 kWCheckingabout 27 min

Heads up

We're double-checking some details for versions marked "Details being checked". Always check your handbook.

Buying a used Avenger

Every version we cover, oldest first, so you can see what you get for the year you're looking at.

Timeline of Jeep Avenger versions for used buyers
YearsVersionUsable batteryRapid max10% to 80%PreconditioningHeat pumpRapid plug
2026 onElectric50.8 kWhCheckingabout 27 minManual onlyCheckCCS

Checklist for this car

Battery health, warranty, cables and test-drive checks are all in our used electric car checklist.

Some details for this car are still being checked — confirm with the seller or handbook.

Battery preconditioning

How to precondition a Jeep Avenger before rapid charging